AJBH
35 Years, Operations
PMP-Certified | Strategic Civil Infrastructure Leader | UAE & India Experience Qualified Independent Director under the aegis of MCA-Govt of India
INDUSTRY
ACADEMIC QUALIFICATIONS
:
PROFILE SUMMARY
Experienced professional with extensive years in project management, scheduling, estimating, negotiations, budgeting, detail engineering, tendering, contracts management, and strategic planning. Recognized as an effective team leader, trainer, and motivator. Self-driven with strong analytical and troubleshooting skills. Excellent written and verbal communication abilities. Expertise in project planning, quality management, cost rationalization, and implementing quality systems. Skilled in mobilizing and managing resources efficiently while maintaining strict compliance with quality parameters and budgetary constraints.
CONSULTING EXPERIENCE
1 years
EXPERIENCE HIGHLIGHTS
Major Achievements:
• Set up of Floating Cassion foundation in place of normal cutting edge with concrete well curb foundation to speed up the construction work of ECRailway rail bridge of river Ganga in Mokama, 2019-2021
• Innovatively Shifting of 400 MT well curb using 50T capacity hydraulic jacks in just 4 hrs saving few lacks and one month time by avoiding mobilizing heavy duty cranes etc., 2019-2021
• Completion of longest urban elevated corridor of 9.2km in Mumbai city named Eastern Freeway by segmental construction using five launching gantries simultaneously, 2008-2013.
• Disaster management post hitting of major earthquake in Gujarat and completed the creek bridge project without any delay. Establishment of prestressing precast casting yard for casting I-girders duly steam cured. Erection of I girder using state of the art Sicet Launching equipment at Suraj Bari Creek Bridge, 1999-2001
• Establishment of casting yard for precast RCC girders and roof elements and construction of bomb proof high security and low security are and main vault for Note Press Construction for Reserve Bank of India in Salboni, 1996-1998
• Fabrication and erection of cable mast for the concrete of over flow section of Almatti Dam Construction of 6 sluice gates in the overflow section of Dam, 1993 1996
• Construction of New Pilani Bypass in Rajasthan, 1991-1992
Gulf Star Contracting LLP, Dubai,UAE
General Manager August 2023 - March 2024
KRAs:
• Responsible for all ongoing execution of Projects.
• Liaisoning with clients and major contractors.
• Managed budget implementations, employee evaluations, and contract details.
• Maximized operational excellence mentoring personnel on management principles, industry practices, and company procedures.
AFCONS Infrastructure Limited, Mumbai
Jt.GM – Projects August 2018 - February 2023
KRAs:
• Timely mobilization of Execution, soil investigation, and survey teams.
• Hiring of design consultant.
• Post initial survey found discrepancy w.r.to NIT and lodged suitable claims.
• Managed budget implementations, employee evaluations, and contract details.
• Launched staff engagement, gender diversity and cultural programs in addition to robust reporting tool that increased operational quality.
• Project Controller and Responsible for the EPC construction of:
-New Rail bridge project-Double line broad guage. East Central Railway 1.8KM long over River ganga in Bihar
-2 viaducts,
-2 Rail Over Bridges
-3 Rail Over Rails Bridges
- 1 RUB and 8 CDs
- Earthen Approaches.
Simplex Infrastructures Limited, Mumbai
General Manager February 2008 - July 2018
KRAs:
• Completed the projects and handed over for public usages.
• Claim realization before the completion of projects (EFW and LB Flyovers).
• Increased profitability and excellent quality work appreciated by client.
• Several projects being handled simultaneously with effective usage of form work and supporting systems.
• Soil improvement with PVD drains in the marshy land of mangroves.
• Chief PM and Project Coordinator responsible for Projects & Contract Management:
- Eastern Freeway Elevated Corridor-Chembur to P'demello Road-9.2 Kms, Mumbai
- Lal Baug Flyover in Byculla-2.5 Kms, ( Casting Yard -Wadala),Mumbai
- Naigaon ROB in Vasai-Mumbai,
- Kalanagar Flyover in BKC-Mumbai,
- Elevated Metro line 7 with 4 stations-Mumbai,
- Metro Line 2B ( Initial phase ),Mumbai
- Mahul Creek Bridge,Wadala,Mumbai
Gammon India Limited, Across Country
Project Manager April 1991 - January 2008
KRAs:
• Construction of Pilani Bypass,Raajasthan
• Fabrication and erection of 45 high cable mast for the concreting of overflow section along with installation of 6 sluice gates-Almatti dam, Karnataka
• SB Creek bridge construction over tidal variation,Kutchch, Gujarat
• Appointed as Project Manager at very young age.
• During January 2001 Kutch region hit with devastating earthquake dislodging the erected span and collapse of labour and staff colony.
• Disaster management done effectively and completed the project ahead of schedule with all odd conditions.
• 2 Km long road bridge over river Baitarini in Orissa.
• Started career as Jr. Engineer and rose up to Project Manager while associated with several challenging and versatile nature of projects as below:
- Sikar Pilani Road Project-Rajasthan,
- Raising of Almatti Dam-Karnataka,
- Construction of New Note Press of RBI-WB,
- Suraj Bari Creek Bridge-Gujarat,
- 47 Bridges in Orissa,
- 2 Flyovers in Amravati-Maharashtra,
- Flyovers in Agra up to Makhkhanpur-UP.
- Rail over Bridge in Tundla,UP